Pool Area Ground Survey Completed

Phase 1 update:  The ground survey of the pools area has been completed. This survey determines how utilities reach the pool area and establishes a pathway for storm drainage. Both our civil engineer and architects will use the survey to determine how construction can proceed. 13147834_10154184332744324_1211037858165921083_o  Based on the information we receive from both those parties we should be able, in the coming weeks, to determine more accurately a timeline for Phase 1 opening.